Court Construction and Installation Process
The construction of a padel tennis court is a multi-stage engineering process that includes site assessment, substructure preparation, superstructure installation, and surface finishing. The average project duration is 20–30 days, while the installation phase is typically completed within 5–7 days. These timelines may vary depending on soil conditions, drainage requirements, weather conditions, and the selected construction system.