The pole pipes placed vertically on the anchor pipes mounted on the line are welded, and the support pipes are connected to these pipes at the top, middle and horizontal. Reinforcement is applied to the horizontal pipes diagonally from the four corners. We lay the vertical pipes at regular intervals on the vertical pipes on the four sides of the field. We place lighting poles on the long side of the court we have built.
The pole pipes placed vertically on the anchor pipes mounted on the line are welded, and the support pipes are connected to these pipes at the top, middle and horizontal. Reinforcement is applied to the horizontal pipes diagonally from the four corners. We lay the vertical pipes at regular intervals on the vertical pipes on the four sides of the field. We place lighting poles on the long side of the court we have built.
Afterwards, we place metal floodlights with a lighting capacity of 400 W on the lighting poles. The floodlights are laid out and put into operation in a way that will safely meet the energy needs of the project with the electrical infrastructure and assembly. We consider whether the field features comply with the standards and mutually determine the most suitable points for the net bar. After the application of the synthetic grass carpet covering, the poles are fixed in place.
Then, porous and PVC-coated wire mesh is stretched to the poles around the court and the entire field is surrounded by a fence.