Court Construction and Installation Process


The construction of a padel tennis court is a multi-stage engineering process that includes site assessment, substructure preparation, superstructure installation, and surface finishing. The average project duration is 20–30 days, while the installation phase is typically completed within 5–7 days. These timelines may vary depending on soil conditions, drainage requirements, weather conditions, and the selected construction system.

Padel Tennis Courts

Padel tennis courts have become one of the fastest-growing sports investments worldwide in recent years. One of the key reasons behind this rapid growth is the social nature of the game, as it is typically played in doubles, making it an enjoyable and engaging activity for friends and families.

Although considered a modern sport, padel originated in the 1970s in Mexico and quickly spread to countries such as Spain and Argentina. Today, it continues to expand globally, attracting players and investors alike.

Professional Padel Court Solutions with B&C Sport

At B&C Sport, we provide fully integrated padel court solutions, managing every stage of the project — from design and engineering to production and installation. Our approach focuses on delivering customized, high-performance courts tailored to each client’s specific needs.

Our Services Include:

  • Turnkey padel court projects
  • Manufacturing in compliance with international standards
  • High-strength steel structure systems
  • Tempered glass panels and professional equipment
  • LED lighting and electrical infrastructure solutions
  • Fast and safe installation by expert teams

With our experienced engineering team and advanced production capabilities, all BC Sport padel courts are built to meet international standards in terms of performance, safety, and durability.

Why Choose B&C Sport?

  • Engineering-driven project approach
  • Premium quality materials
  • Efficient project management and fast delivery
  • Full compliance with international standards
  • Long-lasting, low-maintenance solutions

In conclusion, B&C Sport delivers premium padel court solutions that offer a sustainable, prestigious, and high-return investment opportunity for sports facilities, clubs, and investors.

 

 

Court Construction and Installation Process Construction Stages


  • 1. Stage
    1. Site Assessment and Substructure Preparation The process begins with a geotechnical survey of the site. Soil bearing capacity (CBR value), drainage requirements, and settlement risks are evaluated. The site is then leveled, with a surface slope typically adjusted between 0.5% and 1% to ensure proper water drainage. Excavation is carried out along the perimeter for the reinforced concrete ring beam, which provides structural stability and uniform load distribution.
  • 2. Stage
    2. Reinforcement and Anchoring System After excavation, a reinforcement mesh is installed using ribbed steel bars compliant with international standards. During this phase: Reinforcement spacing is determined based on structural calculations Anchor sleeves are precisely positioned for the installation of steel columns All anchor points are aligned using laser measurement systems
  • 3. Stage
    3. Sub-base and Concrete Application A 10–15 cm compacted granular sub-base layer is applied to enhance drainage and load distribution. A C25/30 grade concrete slab is then poured. The surface is: Finished using a power trowel (helicopter finish) Leveled to meet artificial turf application requirements Equipped with expansion joints where necessary
  • 4. Stage
    4. Steel Structure and Enclosure Installation Once the concrete has cured, the superstructure installation begins: Hot-dip galvanized steel columns are fixed to anchor points Electrostatic powder-coated steel panels are installed 12 mm tempered glass panels (compliant with EN 12150) are mounted on the back and side walls PVC-coated steel mesh fencing (typically 4 mm thickness) is installed for enclosure